Gas Treatment

  • Perla Cardon IV

    Falcón​, Venezuela
    CARDON IV (ENI-REPSOL 50%-50% JV)
    2013 – 2015
    Onshore / Offshore Gas Processing Summary Early Production of The Perla Field with 450 MMscfd of gas and associated condensates, with target up to 1200 MMscfd with the execution of a third development phase early 2018 Self-Execution of all Constructi...
  • Cabrutica GPGP

    San Diego de Cabrutica, Venezuela
    PDVSA
    2011 – 2013 (6 month operation)
    Gas Treatment and Compression Station Summary Gas Treatment and Compression Station Plant to handle 63 MMSFD for Fuel Gas to the Power Generation Plant. Self-Execution of Basic and Detail Engineering as well as all procurement and construction activi...

SUBSCRIBE TO NEWSLETTER

Sign up and receive the latest news via email

  • USA – Headquarters

    14350 Chrisman RD
    Houston Texas 77039 - 1509
    Phone: +1 (713) 467 9560
    See Map

  • Venezuela

    Avenida de enlace con Calle 2,
    parcela E-11.
    Zona Industrial, El Tigre, Estado Anzoátegui
    Phone: +58 (283) 500 1100
    See Map

  • Mexico

    Calle Río Lerma 232, Piso 23. Torre Diana,
    Cuauhtémoc 06500,
    Cuauhtémoc, Ciudad de México
    Phone: +52 (55) 885.27882
    See Map

Cardon IV

Lindsayca has joined Valerus field services to execute fabrication and field assembling activities of the largest offshore gas production in South-America.
Read More