BDC-LT1S/LTW 16” PIPELINE

Summary

  • Main process skids design and fabrication for midstream separation station.​
  • Skid mounted equipment, complete with piping up to skid edge and instrumentation to a local NEMA 4X junction box.​
  • ASME U-Stamp Vessel (Sec VIII Div1), National Board Stamp Vessel.​
  • Pig Launcher/Receiver design by ASME B31.8.​
  • Automation integration of field flow measurements.​
  • Highly instrumented packages.​
  • Export crating for international shipment.​

Description

Fast track engineering, procurement, and fabrication of modularized main process production equipment for early production facilities in Argentina, including Pig Launcher and Receiver Skid, Two-Phase Separator Skid and a Coalescing Filter Skid. Plug-and-Play modularization strategy was applied for ease of field construction. Industry renowned instrumentation, including gas, condensate, and water flow measurements with on skid flow computers, heat tracing and insulation to withstand the cold weather. ​

Slider

Comments are closed.

Cardon IV

Lindsayca has joined Valerus field services to execute fabrication and field assembling activities of the largest offshore gas production in South-America.
Read More