Construction of Operations Facilities on the Production Vessel in the Corocoro Project.

Highlights

  • 100% executed and operating.

Description

Engineering, procurement and construction of temporary processing facilities (TPF):

  • Floating vessel with its own mooring system.
  • Installation of Three (3) gas compressors, three (3) oil separators and three (3) turbine generators at 4160 VAC.
  • Control room located in the Gulf of Paria, capable of separating and measuring liquids and gases, processing 30,000 barrels of liquids per day and approximately 13.5 MMCF/D of gas produced.