Onshore Receiving Facilities

Onshore Receiving Facilities

Highlights

  • Fast Track project with Construction activities.
  • Study for liquefaction risk elimination.
  • Design and Execution of Dynamic Compaction and CMC.
  • Onshore receiving facilities site preparation for Area 1 production.
  • Accommodations and Administration temporary facilities construction.
  • Process equipment foundations.

Description

Lindsayca activities will allow the installation of the onshore equipment that will process the incoming production from Miztón platform located in Gulf of Mexico.

Area 1 is estimated to hold 2.1 Bboe (90% oil) in world-class reservoirs. The development will be phased, initially with an early production phase with startup planned in first-half 2019, through a wellhead platform, located on the Miztón field. Production will be sent onshore through a 10-in. multi-phase line and then treated at an existing Pemex facility. Early production plateau will be 8,000 bopd.

Comments are closed.

SUBSCRIBE TO NEWSLETTER

Sign up and receive the latest news via email

  • USA – Headquarters

    14350 Chrisman RD
    Houston Texas 77039 - 1509
    Phone: +1 (713) 467 9560
    See Map

  • Venezuela

    Avenida de enlace con Calle 2,
    parcela E-11.
    Zona Industrial, El Tigre, Estado Anzoátegui
    Phone: +58 (283) 500 1100
    See Map

  • Mexico

    Calle Río Lerma 232, Piso 23. Torre Diana,
    Cuauhtémoc 06500,
    Cuauhtémoc, Ciudad de México
    Phone: +52 (55) 885.27882
    See Map

Cardon IV

Lindsayca has joined Valerus field services to execute fabrication and field assembling activities of the largest offshore gas production in South-America.
Read More